 This is a building on a military base and was poured monolithically. Which means we poured the walls and floor at once. We had to use a conveyer belt and concrete pump. The reason being is that the wall concrete was actually a different design or kind than the floor mix.In total it was over six hundred yards of concrete. Pretty impressive considering the average house foundation takes around fifty yards!
    
This picture shows you the edge of the building that is actually three feet thick.